QROS analysers were used on the Crossrail project in London to screen excavated soil from the tunnelling to ensure the soil meets the criteria set for final disposal onto Wallasey Island. The combination of low cost rapid analysis together with accurate identification of contamination is essential for this project. 14,000 samples have now been analysed by our technology on this site!


The QROS developed QED analyser is now approved in the US as a replacement for method 8015 (laboratory GC method) for Leaking Underground Storage Tank projects and is also approved by the US Dept of Transportation and the US Navy


QROS analysers were used for the On Site laboratory at the 2012 Olympics site in Stratford East London. QROS had a permanent team at the Olympic Enabling project for a period of over 15 months and were instrumental in bringing in the project 3 months ahead of schedule. On-site screening was conducted for hydrocarbons, heavy metals, phenols, ammonium, cyanide, pH and chlorinated solvents on a routine basis with over 15,000 samples analysed at a rate of over 80 samples as day, with results available in 3 hours from sample receipt.


QROS has provided on-site analysis for the West Ham Flood Alleviation Scheme at Stratford, London, soil and water analysis at Beckton for the London Super sewer.


The UK MOD has taken the QED analyser to various established bases to efficiently and effectively monitor hydrocarbon storage facilities in remote locations.


The QED Hydrocarbon Analyser is now in use in Malé Maldives by the Malé Water and Sewage Company  in their environmental monitoring projects. It is also in use in South Africa and Singapore, as well as

many locations in the USA and Canada.



A Selection of Clients

QROS has built up a very comprehensive list of clients and are proud to say that each one has given us repeat business. The list  includes:


ABB

Adler and Allen

AECOM

AMEC/ Foster Wheeler

Arcadis

Arch Henderson LLP

ARUP

Briggs Marine

Cambridge Nanosystems

Campbell Reith

Carillion Plc

Carnell

Celtic

CH2M Hill

Cheetam Hill Construction

Columbia Technology, Kentucky

Corus

Costain

Defence Estates

Department of Defense US Naval  Air           Station Pensacola Florida

DSM Demolition Ltd

Eastwood & Partners

Ecologia

Enviros

ERM

ESGL

Essar Oil UK

Expanded Structures Limited

Galliford Try

GEA

Geo Environmental

GeoTechnics

GIS

Golder Associates

Halcrow

HBR Ltd

HJB

IH Brown

IKM

Interwaste pty Johannesburg

ITS Singapore

KDC

K-Land

Kleinfelder

Laing 0’Rourke

Lancsville Construction Ltd

Land & Water

Mace Plus

Male Water & Sewage, Maldives

McAlpine

Micholsons

MWH

MVB Joint Venture

North Carolina Department of Transportation

Nuttall

O’Keefe

OHES

Ramboll

Redlab llc

REC

Royal Air Force

Schnabel Engineering

Site Remedial Services

Sivyer Transport

Soilutions

Soilfix

S Walsh

Tamdown

Terra Vac

Toureen Mangan

University of Wisconsin

URS

US Naval Air Station, Kingsville, Texas

Veolia

VHE

Wakefield Council

White Young & Green

Wimpey Homes

WSP Parsons Brinckerhoff


Notable Projects

QED CASE STUDIES


Arcadis Study


ATC Cardno Case Study


GRI Case Study

Back Next
 QED  Contact About QROS Other Analysis Methods Hydrocarbon Analysis

info@qros.co.uk

© 2017 QROS Ltd